Eid-El-Kabir: Ikeja Electric Promises Improved Power Supply |    Ikeja Electric Expands Strategy To Curb Vandalism |    Darkness Looms as NUEE Lays Siege at Ikeja Electric |    Ikeja Electric Parleys With Local Publishers For Outreach To Communities |    Ikeja Electric Promotes 299 Employees, Employs Over 500 New Staff |    3 Remanded in Prison for Stealing Ikeja Electric cables |    IKEJA ELECTRIC Keeps Promise, Unveils Aggressive Metering Plan |    IE PowerPlay Debuts on Google Playstore |    Ikeja Electric Introduces Crowd Management Technology At Service Centers |    More Accolades For Ikeja Electric's Safety Initiatives |    Ikeja Electric Deploys Technology To Reduce Downtime |    Ikeja Electric Moves Against Illegal Reconnection Cartel In Akute, Nabs Kingpin! |    Ikeja Electric Canvasses Dialogue As Akowonjo Holds Customer Fair |    Ogba Area Command Assures Ikeja Electric Of Support |    Ikeja Electric Customers To Enjoy Improved Turnaround Maintenance Services |    Ikeja Electric Reaffirms Support For Education Sector Development |    Ikeja Electric Recruitment Policy Boosts Enrollment Into Technical Colleges |    Lagos State Education Board Lauds New Approach To Safety Education |    Amikanle, Abule Taylor And Environs Get Lifeline |    Heavy Rain Wrecks Havoc |    Ikeja Electric Analyst, Michael Oladeji Bags ICAN Award |    Ikorodu Business Unit Upgrades Equipment To Boost Service Delivery |    Ikeja Electric Assures Maximum Utilization Of Newly Commissioned 2 X 60MVA Power Transformer At Odogunyan     Alimosho Residents To Enjoy More Supply As TCN Commissions 100MVA 132/33KV Transformer |    Ikeja Electric Takes Kick-Malaria Campaign To Waterside Communities |    Ikeja Electric Records Zero Fatality in Q1-2018 |    Ikeja Electric Partners L.E.A.R.N To Advocate Electrical Safety For Teenagers And Youth |    Nigerian Society Of Engineers (NSE), Endorses Ikeja Electric's Power Play Board Game    Ikeja Electric Moves To Protect Customers |    Ikeja Electric Presents Power Play Board Game To Unilag     Lagos State Safety Commission Endorses Ikeja Electric's POWER PLAY Board Game |    Ikeja Electric Commissions Additional Feeders In Igbogbo, Ikorodu |    Community Lauds Ikeja Electric Over Youth Empowerment |    "NOW I TRULY BELIEVE" Energy4Life Winner Exclaims As Bonus Hits Account |    Ikeja Business Unit Launches Customer Fair |    Cost Reflective Tariff, Our Challenge |    Ikeja Electric Partners CDCs And CDAs To Empower New Payment Agents |

Ikeja Electric Network

NB: Ckt = Circuit Kilometers

6 Business Units (BU)
10 Transmission Substations
84 33/11 kV Transformers
575 33/0.415 kV Transformers
6131 11/0.415 kV Transformers
1325MVA Installed Transmission Capacity
1260MVA Installed Transformer Capacity (33/11 kV)
251.4MVA Installed Transformer Capacity (33/0.415 kV)
1652.75MVA Installed Transformer Capacity (11/0.415 kV)
1620.64 Ckt Kms* Route Length 33KV Feeders
2087.5 Ckt Kms Route Length 11KV Feeders
9435.47 Ckt Kms Route Length of 415V Lines
22.0 Ckt Kms Longest Urban 33KV Feeder
15.7 Ckt Kms Average Route Length of Urban 33KV Feeder